We are recruiting on behalf of a leading International company who are putting a team together at FEED Stage for a major upstream Oil & Gas Development in UAE
Flight tickets are covered for a total amount of 500$ both ways. 
Work permit and medical insurance provided.
- Project coordination of Piping team and reporting to Project or Engineering Manager on project related matters 
- Act as Piping Lead Engineer for the project. 
- Planning, scheduling and execution of discipline activities and deliverables, including manhour estimating when requested. 
- Manage discipline work to the required schedule and manpower allocation, including requesting personnel as identified by the plan, and day-to-day supervision of piping discipline personnel on the project. This includes approval of timesheets, holiday approval and overtime approval where delegated 
- Review project Basis of Design (BOD) and Project Execution Plan (PEP) 
- Liaise with project team, client, fabricator / installer or other parties as required to determine and impliment piping project reporting needs 
- Ensure the piping project reporting format adheres to Company and Client standards and procedures 
- Report on work status /problem areas / needs on a weekly and monthly basis. 
- Perform Piping Design activities, including checking, as required in accordance with the Operation of Discipline proecedure 
- Ensure all project documentation is checked in accordance with the Operation of Discipline procedure 
- Coordinating with all disciplines (as necessary) in the preparation and development of project deliverables and ensuring that other disciplines’ input is incorporated 
- Ensure Piping 3D model and / or 2D package quality and completeness 
- Review Piping 3D model and / or 2D package to confirm adherence to Company and Client standards and procedures, utilising 3D design software tools as appropriate 
- Perform periodic overall model reviews to assure level of content. Reviews for overall completeness, general safety issues, access and egress, materials handling scheme is being adhered to, maintenance and operability 
- Ensures the project Piping team is meeting the requirements for formal and informal Engineering / Client 3D model review(s) as per Company / Client procedures. 
- Work with the 3D CAD Coordinator to assure that project is closed out properly upon completion